METHOD STATEMENT FOR PIPE JACKING WORK

Hình ảnh
INTRODUCTION 1.1   Introduction The Vung Ang II thermal power plant is part of the Vung Ang thermal power center and is the second complex of the coal-fired electricity generating plant located in the Vung Ang industrial zone, Ky Loi commune, Ky Anh district, Ha Tinh province in Vietnam. Vung Ang II will be constructed adjacent to Vung Ang I which is already in operation. It consists of two turbines with a total capacity of 1,200 MW. Both will be fueled by imported anthracite, hard coal. 1.2       Abbreviation and definition The Owner         Vung Ang II Thermal Power LLC The Contractor   DHI-SCT Joint Venture HSE                    Health, Safety and Environment MS                      Method Statement RA                      Risk Assessment PPE                     Personal Protective Equipment QA/QC                Quality Assurance/Quality Control        1.3       Scope of work To install the CW underground pipeline of Vung Ang 2 Thermal Power Plant at crossing area with Vung Ang